The General Manager of ATC, during his long international career, in “front line” of important projects, gained a unique experience in project development and management particularly in large scale mixed-use and hospitality sector, having been involved in the following projects:
TOWERS
GARREL TOWER
Client: PIERUS – Garrel
Location: Dubailand
Year: 2006-2007
Scope: Project design development, as client representative
Position: COTEBA Project Director
Project: Two 60-level towers, 150.000 m2 including a 4 stars hotel, a 3 stars hotel, more than 1,000 hotel rooms together, service apartments, offices, convention centre, shopping mall, business centre, fitness club, etc. More than 1,000 underground parking spaces.
MARINA SKY TOWERS
Client: East & West
Location: Marina Dubai
Year: 2007-2008
Scope: Project Management, design development, ready for construction
Position: COTEBA Project Director
Project: Twin towers, offices and residential on a common podium, on a prime location at the Dubai Marina, 200.000 m2of GFA.
ENOC TOWERS
Client: ENOC
Location: Dubai Business bay
Year: 2008
Scope: Project initiation and design proposal
Position: COTEBA,Project Director
Project: 4 towers in a common podium in business bay facing the the Burj Khalifa tower. Pre-Concept design to initiate project.
OFFICES
COGEN HELLAS H/Q
Client: COGEN
Location: Athens
Year: 2001
Scope: Office renovation
Position: COGEN, Development director
Project: Handover of 300 m2 luxury offices, facing the Greek parliament, for the use of the company.
PART DIEU ILOT H
Client: R.A.C.
Location: Lyon Part Dieu
Year: 1988
Scope: Structural design
Position: SERALP, Project Engineer
Project: R+8 grade A Office building over a 2 lanes road.
PONTE NUOVO
Client: Ecully Municipality
Location: Ecully
Year: 1988
Scope: Concept of Structural design
Position: SERALP, Project Engineer
Project: Project Initiation, office building, landmark of Lyon, over the highway Paris- Lyon.
RESIDENTIAL
ILOT ST LOUIS
Client:
Location: Lyon, Place St Louis
Year: 1988
Scope: Engineering Design, site coordination.
Position: SERALP, Project Engineer
Project: Medium cost B+G+5 residential building in Lyon.
MERCIERE JACOBINS
Client: SCIC
Location: Merciere road & Jacobins Place, Lyon
Year: 1987
Scope: Engineering Design, site coordination.
Position: SERALP, Project Engineer
Project: Medium cost B+G+5 residential building in Lyon.
PART DIEU ILOT H
Client: R.A.C.
Location: Lyon, Part Dieu
Year: 1988
Scope: Structure Engineer
Position: SERALP, Project Engineer
Project: Residential building G+6, One level underground parking.
VOLOS
Location: Volos, Greece
Year: 2001
Scope: Development, Design, Project & Construction management
Position: SERALP, Project Engineer
Project: Residential building B+G+5, With F&B at ground Level.
HOSPITALITY & LEISURE
CLUB OCCAJ
Client: CDC
Location: Les Arcs 2000
Year: 1990
Scope: Project Development & Construction Management
Position: SMA, Project Director
Project: G+11, 2 stars Hotel 224 rooms, in Arc 2000 ski resort. Construction in 7 months and Renovation of the “Aiguille Rouge” restaurant.
HOUSE OF TOURISM
Client: SIVABEL
Location: Val Thorens, ski resort
Year: 1990
Scope: Engineering Design & Project management
Position: SERALP, Project Engineer
Project: B+G+5 short stay residential building in Val Thorens ski resort.
HOTEL DU GOLF
Client: CDC
Location: Les Arcs 1800
Year: 1990
Scope: Construction Management
Position: SMA, Project Director
Project: Renovation, 246 rooms 4 stars Hotel, in Arc 1800
VOGEL/ALLIET/AIG. GRIVE II
Client: SMA
Location: Les Arcs 1800
Year: 1989/1990
Scope: Project Development & Project Management
Position: SMA, Project Director
Project: Several buildings G+4 to G+6 residential, 600 short stay apartments.
SEQUOIA LODGE
Client: EURODISNEY
Location: Paris Area
Year: 1992
Scope: Construction Management
Position: Site Manager
Project: 4 stars hotel, 1011 rooms themed with events and leisure facilities, important landscape.
CONRAD CAIRO 5* HOTEL AND SERVICED APARTMENTS
Client: AIB
Location: Cairo
Year: 1995
Scope: Client Representative
Position: HILTON Corp. Project Director
Project: 5 stars, 700 rooms luxurious hotel, with Casino, Convention center, restaurants etc. 32 level tower, extension of the World Trade Center of Cairo. Renovation of 120 serviced luxury apartments, 32 levels tower.
ASTIR PALACE
Location: Athens
Year: 1995
Scope: Due Diligence
Position: HILTON Corp. Project Director
Project: Due diligence and renovation report for this exceptional 3-hotel complex and bungalows overlooking the sea.
ILLULISAT RESORT
Client: 3MY
Location: Dubai
Year: 2008
Scope: Project Initiation
Project: Concept and CAPEX evaluation of a resort in World island project in Dubai (Illulisat Island).
NEW TOWNS & MIXED USE DEVELOPMENTS
AMWAJ
Client: SAMA DUBAI
Location: RABAT, MOROCCO
Year: 2006/2008
Scope: Project Management
Position: COTEBA, Project Director
Project: A new Town, mixed-use development with leisure facilities between Rabat & Sales (Bouregreg Valley) Morocco of equivalent 30.000 inhabitants, GFA 1.6 million m2 plus parking, 3 billion USD project.
TRIPOLI MARINA
Client: LIBYAN EMIRATES HOLDING
Location: TRIPOLI, LIBYA
Year: 2006/2008
Scope: Project Management
Position: COTEBA, Project Director
Project: A new Town of 600.000 m2 Mixed-use development in Tripoli’s best location in 2 km of waterfront. Concept design by F+P
SAMHA GARDENS
Client: E&W
Location: Samha, Abu Dhabi
Year: 2006/2008
Scope: Project Management
Position: COTEBA, Project Director
Project: A new Town of innovative concept “Sand-alone” of 500.000 m2 Mixed-use development.
HALF MOON BEACH
Client: ABIAT
Location: Dammam, KSA
Year: 2009/2012
Scope: Project Management
Position: COTEBA, Project Director
Project: Development of a new Town of 350.000 inhabitants in 30 years mixed-use development, with holistic approach, Cost evaluation, market research, SWOP analysis, positioning and branding of the town.
CULTURE & EDUCATION
OPERA OF LYON
Client: Lyon Municipality
Location: Lyon
Year: 1988
Scope: Structural design, verification during rehabilitation phasing.
Position: SERALP, Project Engineer, Project Director
Project: Complete rehabilitation of Lyon’s opera.
TEMPORARY MULTI-ACTIVITIES
Client: SMA
Location: Les Arcs 1800
Year: 1990
Scope: Project Management
Position: SMA, Project Director
Project: Installation of a temporary inflatable multi-activities structure.
INTERNATIONAL ACADEMY
ARABIC ACADEMY
Client: Faran Investment
Location: Reem island, Abu Dhabi
Year: 2014
Scope: Project Management (Design Development)
Position: Project Director
Project: Two private schools of high standards, 20.000 m each, Design by Stride and Treglown.
INDUSTRIAL & COMMERCIAL
SANOFI
Client: Sanofi
Location: Jeddah
Year: 2010
Scope: Concept design coordination, constructability & cost evaluation
Position: COTEBA, Project Director
Project: Pharmaceutical pills plant, 7.000 m2 at King Abdulla industrial Zone, Jeddah.
BIANCHINI FERRIER
Client: Bianchini Ferrier
Location: Lyon
Year: 1988
Scope: Structural design and site technical coordination.
Position: SERALP, Project Engineer
Project: Silk activities, luxury products
CARREFOUR
Client: CARREFOUR
Location: Givors France
Year: 1997
Scope: Project Management
Position: Project Director
Project: Renovation of the mall gallery, of the Hypermarket and implementation of the new parking concept and packaging. Works organized with Mall full operational.
HEALTHCARE
VIP HOSPITAL IN AL AIN
Client: Faran Investment
Location: Al Ain
Year: 2015
Main Consultant: STH
Scope: Design Coordination
Position: Project Manager
Project: VIP Hospital in Al Ain 110 beds, VIP services.
INFRASTRUCTURES
HIGWAYS AND BRIDGES
Client: RCA
Scope: Inspection Engineer, due diligence,
1979 Inspection and database creation of all French concrete Paving Highways
1980 Inspection of hundred bridges in France, to establish an Operation & Maintenance database.
HANGAR –SALT STORAGE
Client: SAPRR
Location: Gannat
Year: 1987
Scope: Concept of structures
Position: SERALP, Project Engineer
Project: Wood structure for salt storage
VIADUC DE LA BEAURE
Client: SCETAUROUTE
Location: Valence-Grenoble highway
Year: 1988
Scope: Preliminary design
Position: SERALP, Project Engineer
Project: Viaduc 60-80-80-80-60m spans, pre-stressed concrete
RETAINING WALL
Client: DDE Grenoble
Location: RN 75
Year: 1987
Scope: Structural design
Position: SERALP, Project Engineer
Project: Retaining wall with passive anchorage
NOISE REDUCTION WALL
Client: SAPRR
Location: Villefranche
Year: 1987
Scope: Structural design
Position: SERALP, Project Engineer
Project: Concrete precast wall, some elements with Plexiglas
NOISE REDUCTION WALL
Client: Ecully Municipality
Location: Ecully, Lyon Highway
Year: 1988
Scope: Concept structural design
Position: SERALP, Project Engineer
Project: Special precast wall with sound absorption
ROADS
Client: Euro Disney
Location: Euro Disney
Scope: Construction Management
Project: Internal road on Euro Disney site between hotels
RADAR TOWER
Client: Thales
Location: New Dubai Central Airport
Year: 2010
Scope: Construction Management
Position: COTEBA, Project Director
Project: Concrete tower for radar installation.